Case Study: Woolton High School

THE BRIEF:

The area was initially all turf, we excavated the whole area, installed concrete PCC edging kerbs around the whole perimeter, built up the area with stone. Due to inadequate drainage we used an open grade porous binder and surface course.

THE RESULTS: The client was very extremely happy with their new surfacing.

#potholes #reinstatement #resurfacing

Featured Posts
Recent Posts